Chris Cicchetti | Bay Area Senior Software Developer

  • Full Screen
  • Wide Screen
  • Narrow Screen
  • Increase font size
  • Default font size
  • Decrease font size

Work Portfolio

Chris Cicchetti's Work PortfolioBelow you can find information about my patents, speaking engagements, and published articles, as well as a few collateral examples. Click on the links below to go to the desired section.

Patent Portfolio
Speaking Engagements
Published Articles
Collateral Examples


Patent Issued (Hardware Engineering)

  • 7,546,451 Continuously Providing Instructions to a Programmable Device

Patents Issued (Network Protocol Testing)

  • 7,007,208 Systems and methods for data unit modification
  • 7,231,558 System and Method for Network Error Rate Testing
  • 7,593,345 Altering latency for network testing
  • 7,602,772 High density optical network access switch

Patents Pending (Copper/Optical Network Monitoring)

  • 20070058641 Enterprise Physical Layer Switch
  • 20070081549 Network Tap/Aggregator Configured For Power Over Ethernet Operation
  • 20070081553 Network Tap Device Powered By Power Over Ethernet

Patent Pending (Network Protocol Testing)

  • 2004012918 System And Method For Network Error Rate Testing

Return to the top of the page


Speaking Engagements

  • Sept. 2011: SICL Trade Show - Leeds, England - "Take the Bite Out of Your VMware Licensing Cost"
  • Jun. 2011: Virtualization Summit - Singapore - "Four Steps to Virtualization Management Success"
  • Sep. 2009: Storage Developer Conference (SDC) - San Jose, CA - "New Test Challenges on FCoE"
  • Sep. 2009: The SATA International Organization (SATA-IO) Industry Forum - Milpitas, CA -"It’s A Wonderful (Testing) Life"
  • May 2009: The SATA International Organization (SATA-IO) Annual Members Meeting - Milpitas, CA -"Successful 6 Gb/s SATA Equipment Design and Development"
  • Jun. 2008: The International Disk Drive Equipment and Materials Association (IDEMA) - Bangkok, Thailand - "Successful Test Equipment Use: What You Need To Know At 6Gb/s And Beyond"
  • Apr. 2008: The International Disk Drive Equipment and Materials Association (IDEMA) - Singapore - "Successful Test Equipment Use: What You Need To Know At 6Gb/s And Beyond"
  • Apr. 2008: The SATA International Organization (SATA-IO) Annual Members Meeting - Milpitas, CA - "Successful Test Equipment Use: What You Need To Know At 6Gb/s And Beyond"

Return to the top of the page


Published Articles

  • Magazine Article (Data Centre Solutions – Feb. 2011): "Get More for Less: Active Continuous Optimisation Solves the Data Centre Riddle"
  • Magazine Article (SNS Europe – Jan. 2011): "Better Storage Performance for Less: Active Continuous Optimisation Is the Holy Grail of Storage Optimisation"
  • Magazine Article: SAS/SATA-What You Need to Know for 6 Gb/s and Beyond
  • White Paper: Network Access via TAPs
  • White Paper: Designing Critical Enterprise SANs for Troubleshooting

Return to the top of the page


Collateral Examples

You are here: Professional Work Portfolio